The Mirapath Podcast
AI compute is changing the physical requirements of the data center. In this episode, Legrand's Jon Inaba explains why power availability, rack density, cooling architecture, and operational planning must be considered together.
Jon Inaba, CDCD, is Vice President of Field Sales Engineering for Legrand's Power and Thermal Management division. In the episode, he describes leading teams that work across power, cabinets, containment, and data infrastructure. His route into data center technology began after nearly a decade as a professional chef, followed by a move to a small infrastructure reseller in the early 2000s. His public LinkedIn profile also lists the NYU Stern Executive Program in Leadership Development among his education.
That combination of operational experience and infrastructure leadership shapes a practical conversation about a market in transition. Inaba and the podcast host examine why today's facilities cannot rely on a single repeatable power-and-cooling recipe, how growing demand changes the discussion around efficiency, and why the industry needs both technical creativity and a stronger talent pipeline.
At a Glance
- Inaba describes a shift from broadly similar data center architectures to environments that may range from roughly 20 kW cabinets to 100 kW and beyond.
- Cooling choices vary with the heat load and can span air-based approaches through two-phase direct-to-chip designs.
- Power generation and distribution capacity now influence where and how large data center projects can be built.
- Efficiency gains at the component level do not necessarily reduce total consumption when overall digital demand continues to grow.
- Knowledge sharing and broader pathways into technical roles are essential as the industry prepares its next generation of professionals.
Why AI Density Changes the Power and Cooling Design
Earlier in Inaba's data center career, power and cooling architectures were far more consistent from one facility to the next. That consistency made many design assumptions more predictable. In today's market, he sees a much wider range of cabinet densities and supporting technologies.
Inaba illustrates the range by comparing an approximately 20 kW cabinet with designs at 100 kW and beyond. He also contrasts passive air cooling around the lower end of that spectrum with two-phase direct-to-chip cooling for much higher heat loads. These figures are examples from his experience, not universal thresholds. The appropriate architecture still depends on the IT equipment, workload, facility systems, site conditions, and operating model.
The important planning lesson is that rack density cannot be isolated from the rest of the deployment. Power distribution, thermal management, cabinets, containment, network infrastructure, monitoring, and service access need to function as one production system.
Power Availability Is Now a Front-End Planning Constraint
Inaba also points to a change in project scale. He recalls a time when adding a megawatt could be accommodated more readily because generation and distribution systems had available capacity. He contrasts that with current projects that may seek hundreds of megawatts, creating a different set of questions around generation, transmission, grid access, redundancy, and location.
That does not mean every AI deployment requires a hyperscale build. It means power availability should be validated early, at the scale relevant to the project. A deployment plan can be technically sound inside the white space and still face schedule or feasibility risk if the site cannot support the required power.
For enterprise teams, the conversation should therefore connect the compute plan to utility coordination, facility capacity, phasing, and future expansion. The goal is to understand the power envelope before procurement and installation decisions narrow the available options.
Efficiency and Growth Must Be Considered Together
When the conversation turns to sustainability, Inaba argues that finite power availability will push the industry to ask how it can do more with existing resources. He sees efficiency as a necessary design objective, while also warning against assuming that more efficient components will automatically lower total industry consumption.
His comparison is straightforward: improvements in lighting technology reduced the power used by an individual light source, but people also found more places to use lighting. Data centers may follow a similar pattern. Compute can become more efficient while aggregate demand continues to expand.
This distinction matters for infrastructure planning. Teams need to consider both unit efficiency and total demand, then make assumptions visible in capacity plans. A design that performs efficiently at a defined load still needs a credible view of utilization, growth, and operational controls.
Build Transparency Around the Actual Site
Inaba encourages a more transparent public conversation about data center infrastructure. Water use, cooling-loop design, energy sources, emissions, and redundancy differ by facility. Clear site-specific information helps stakeholders evaluate a proposed project without treating every data center as though it uses the same architecture or has the same impact.
For operators and project teams, transparency begins with documented requirements and measurable operating conditions. It also requires explaining trade-offs in language that technical, business, and community stakeholders can understand.
Knowledge Sharing Strengthens the Talent Pipeline
Inaba's career path is a reminder that data center expertise can begin outside a traditional engineering route. He earned a degree in political science, worked in fine dining and sushi as a professional chef, and then entered technology through a reseller. What carried across those settings was the ability to solve practical problems under pressure.
He applies that same principle to team development. Inaba describes a recurring internal exercise called "Bet You Didn't Know," in which a team member gives a short presentation about a tool, technology, or application and then opens the topic for discussion. The format helps people practice explaining technical information while exposing colleagues to knowledge from adjacent disciplines.
That cross-functional learning matters because data center work spans power, HVAC, connectivity, controls, construction, sales, service, operations, and many other specialties. Inaba encourages early-career professionals not to judge the industry by its surface image. He also highlights the need to create stronger pathways for women in engineering and for people who prefer technical and trade careers outside a four-year engineering degree.
Questions Infrastructure Teams Should Ask Before Deployment
The episode does not prescribe one architecture. Instead, it offers a useful way to frame early planning conversations:
- What load will each rack support at launch, and what density is expected later?
- Which cooling approach matches the heat load, IT equipment, facility systems, and maintenance model?
- How much utility and on-site power capacity is available, and what expansion is realistically supportable?
- Which interfaces among power, cooling, cabinets, containment, connectivity, controls, and monitoring require joint validation?
- How will the team measure efficiency while also accounting for total demand growth?
- What information should be documented for operators, executives, regulators, and local stakeholders?
- Where does the organization need cross-training or outside expertise to close knowledge gaps?
These questions align technical choices with deployment risk. They also help organizations distinguish between equipment capacity on paper and infrastructure that can be installed, operated, maintained, and expanded in production.
Key Takeaways
- AI data center power and cooling decisions should begin with the actual workload, density, site, and operating requirements.
- A wider range of rack densities is producing a wider range of supporting architectures; there is no single design recipe for every deployment.
- Power availability can determine project feasibility and should be evaluated before downstream design and procurement decisions are fixed.
- Efficiency metrics are most useful when paired with a realistic view of total demand and growth.
- Transparent, site-specific communication is more useful than broad assumptions about data center impacts.
- Cross-functional learning and more inclusive career pathways can help the industry develop the talent it needs.
Frequently Asked Questions
Why does AI change data center power and cooling requirements?
AI systems can concentrate more power and heat within a cabinet. Inaba explains that this wider range of rack densities can require different power-distribution and cooling architectures, depending on the equipment, heat load, facility, and operating model.
Is there one best cooling design for high-density AI racks?
No. Inaba's central point is that the supporting technology changes with the application and heat load. Air-based and direct-to-chip approaches can serve different requirements, and the correct choice depends on the complete deployment environment.
When should power availability be evaluated for an AI deployment?
Power availability should be evaluated early enough to influence site, capacity, phasing, and architecture decisions. The episode emphasizes that generation and distribution constraints can affect whether a proposed deployment is feasible at the required scale.
Listen to the Full Conversation
Hear Jon Inaba's complete discussion of AI data center power, cooling, efficiency, industry collaboration, and workforce development on The Mirapath Podcast.